Home Board of Directors Regional Members Associate Members Training Manual - Production Industry Events Members Area Contact

En Français



Search Website

Wood Structural Systems
Canada's National Code System
Roles and Responsibilities
Applications
Shapes
Spans
History

Bracing
 Step 1 
 Step 2 
 Step 3 
 Step 4 
 Step 5 
 Step 6 
 Step 7

Materials 
Design
Codes and Standards
Truss Configurations 
Gable Roof 
Girder and Valley
Hip Roof 
Truss Support
Preservative Treatments and Truss Plates
Manufacture 
Quality Control 
Storage 
Handling and Installation
Fire Safety 
Additional Info

 






Step 5: Temporary bracing of bottom chord plane
To hold the proper spacing of the bottom chord, continuous lateral bracing at no greater than 2.4 to 3 m on centre along truss length is used for the full length of the building, secured to the bottom chord. Diagonal bracing at 45° between laterals will stabilize this bracing system. The bracing is usually left in place to become part of the permanent bracing system. Once the temporary bracing is properly installed, permanent bracing and decking can be installed. Concentrated loads from sheathing or roofing material should not be placed on trusses. These loads should be spread evenly over a large area to prevent overloading of any one truss. A limit of eight sheets of plywood should be placed on any pair of trusses and should be located adjacent to the supports. 


 